Line 5 has been in violation of its1953 Easement with the State of Michigan for years. How long must we wait for the DEQ, AG, and governor to take action?

“Easement with the State of Michigan limits unsupported stretches of Line 5 to 75 feet for the pipeline’s structural integrity and longevity. This neglect coupled with the Straits powerful underwater currents likely has caused metal fatigue damage.

The law is clear. The State of Michigan and MDEQ have (“a perpetual duty … to secure to its people the prevention of pollution, impairment or destruction of its natural resources, and rights of navigation, fishing, hunting, and use of its lands and waters for other public purposes.”) Therefore, the MDEQ must undertake a formal comprehensive review of impacts and alternatives associated with Enbridge’s entire Line 5 pipeline in the Straits and waters and bottomlands of the Great Lakes.

This duty is separate and independent from the Line 5 risk and alternative studies commissioned by the Michigan Pipeline Safety Advisory Board.

In sum, no final permit should be authorized until Enbridge has demonstrated the following: (1) Line 5 in the Straits is not likely to impair the protected public trust waters and uses in the Straits and beyond; (2) there exists no feasible and prudent alternative to Enbridge for Line 5 in the Straits within Enbridge’s overall capacity throughout its “Lakehead” or Great Lakes pipeline system; (3) it has provided additional information on the pipeline metal fatigue and heightened risk of failure; and (4) it is not violating the 1953 Easement with the State of Michigan.” Oil and Water Don’t Mix.

Please submit your public comment to the MDEQ at: www.oilandwaterdontmix.org/anchor_structure_public_comment

Janet Fairchild

Alpena